Walls in interior areas - The multi-functional construction panel: application on the wall (example)

1

We recommend horizontal laying for ELEMENT-VK on the wall.

2

Before attaching, if possible, position the alignment markings on the floor and ceiling. Then press on the ELEMENT with the level and spirit level and check not only the individual and reciprocal vertical and horizontal alignment of the ELEMENT construction panels.

3

Additionally dowel with FIX-FID or FIX-KSD. Pay attention when dowelling to water and power lines! Before applying the adhesive, pre-pierce the holes for the dowels with a cross slot screwdriver.

4

Seal the dowel pin heads using a small piece of sealing tape DRY-DBV and DRY-ASK. DRY-ASK is applied using a brush or spatula. Gluing of the cut-to-size sealing tape takes place using DRY-ASK. Then level out using DRY-ASK.

5

Sealing of the joints using sealing tape DRY-DBV and DRY-ASK. DRY-ASK is applied using a brush or spatula. Gluing of the sealing tape takes place using DRY-ASK. In the second step the joint is levelled out using DRY-ASK.